Data center decommissioning.
Finish the whole project.
The final rack is only part of the job. Plan the equipment, shutdown dependencies, access windows, data processing, and building handback together.
Acceptance, handling, and terms confirmed before scheduling.

What belongs in the conversation.
Describe what you have. Flag what needs a closer look.
Servers, storage & network equipment
Racks, cabinets & cable infrastructure
UPS systems and batteries for separate review
Server rooms, cages & multi-rack projects
The right next step.
Not an assumption.
Rack and room retirements, equipment removal, media decisions, and handback planning.
Use the planning guide ↗Define what leaves—and what stays
Map the room, rack positions, device identifiers, and exclusions. Make the difference between a rack removal, a cage closure, and a full room handback explicit. Agree on the acceptance criteria with facilities before setting the removal sequence.
Put shutdown authority with the right people
Your authorized IT and facilities owners must approve migration, retention, system shutdown, and release. Electrical isolation and specialist disconnection work belong to qualified personnel. A removal request is not authorization to disconnect live infrastructure.
Plan the route out of the building
Share loading-dock restrictions, freight-elevator details, working hours, escorts, and insurance requirements. Identify unusually heavy or fixed items. Confirm packing, lifting, labor, and transport responsibilities in the scope.
Track two kinds of closeout
Physical handback and data/reporting closeout are separate milestones. Reconcile removed assets, processing results, exceptions, material destinations, and any resale settlement rather than treating an empty room as proof that every task is finished.
A useful brief.
A clearer quote.
Rough quantities are welcome. You do not need to solve every detail before asking.
- Rack or room count and inventory
- Shutdown owner and handback deadline
- Media policy and processing location
- Building access and removal constraints
ISO 14001:2015, R2v3 & e-Stewards certified. Confirm the applicable scope and records for your project.
Review the standards & documentation ↗Before you get started.
Can a project include metal and batteries?
Do you provide a project checklist?
Related services.
Explore the full offering ↗IT asset disposition
Business technology retirement, reuse assessment, and asset-level reconciliation.
Explore serviceBattery & UPS recycling
Chemistry- and condition-led planning for business batteries and backup power systems.
Explore serviceScrap metal recycling
Ferrous and non-ferrous material from trades, production, cleanouts, and retired equipment.
Explore service