IronbayRecycling & Recovery

Manufacturing & fabrication

Plan for production scrap, industrial electronics, and facility changes as distinct streams within one coordinated brief.

What is different here

Recurring production material

Describe average volume, known grades, contamination, collection points, and the cadence that fits production.

Information in industrial equipment

Flag configuration data, proprietary programs, and embedded storage for security review before release.

Access around operations

Provide shift patterns, shutdown windows, loading details, and specialist lifting or removal requirements.

Planning priorities
Material separationSite accessProgram cadence

Identify routine material flows separately from one-time line changes or equipment retirements.

Plan your vendor review
Items to include in your project brief
  • Metal offcuts & production scrap
  • Copper, aluminum & steel
  • Industrial PCs & controls
  • Test equipment
  • Racks, cables & backup power
Chain of custody

Six decisions.
A plan for your project.

01

Identify

List material or equipment, quantity, condition, location, and unknowns.

02

Approve

Confirm who can authorize release, sale, data processing, or records disposal.

03

Scope

Agree on acceptance, responsibilities, logistics, reporting, and commercial terms.

04

Handover

Confirm the destination, collection or delivery plan, and signed record.

05

Process

Keep material streams and any data-handling requirements identifiable.

06

Reconcile

Review the agreed records and resolve exceptions before closeout.

Retiring equipment in manufacturing?

Tell us what is coming out and who needs the paperwork. Include any internal approvals, security requirements, and site constraints.